Supplier: Changxing Yongcheng Industrial Furnace Co., Ltd
User: Anhui Anqing Garden Tools Co., Ltd
Equipment name: continuous quenching tempering production line
Equipment model: rcw100-160
Scope of application: continuous quenching tempering heat treatment of steel products
Rated power: 160kW
Rated temperature: 950 ℃
Temperature control accuracy: ± 1 ℃
Furnace temperature uniformity: ± 5 ℃
The production line includes: automatic steel belt turntable feeding machine, quenching furnace (7000mm * 280mm * 200mm, power 160kW), tempering furnace 1 (power 9000 * 280 * 200, power 120kw), tempering furnace 2 (power 9000 * 280 * 200, power 120kw), water cooling jacket (6000mm), with a total length of 40-45m;
Floor area of production line installation: about 42.5m in length 1m in width, excluding the floor area of control cabinet (3m × 1m)
Technological process: automatic feeding - atmosphere protection quenching heating - tempering 1 - tempering 2 - cooling pool lifting - automatic coiling
Quenching temperature: 880 ℃
Tempering temperature: 400 ℃
Output: 5-7t / day
1. Installation
(1) After the equipment is transported to the production site of the demander, the Demander shall be responsible for the equipment in place according to the plane position designated by the supplier, the supplier shall send personnel to assist.
(2) The supplier shall be responsible for the installation of equipment accessories with the assistance of the demander.
(3) The secondary wiring piping between the control cabinet furnace body shall be provided by the demander according to the requirements of the supplier.
2. Test run
(1) During commissioning, the supplier shall assign personnel to carry out installation mechanical commissioning.
(2) The supplier shall be responsible for the technical training demonstration operation for the operation maintenance personnel of the demander, the supplier shall provide technical documents (instruction manual electrical schematic diagram) for the study of the supplier's personnel to further understand the performance of the equipment.
3. Final inspection
(1) The equipment shall meet the requirements of the technical agreement after no-load, load test run. The supplier shall assist the demander in product process commissioning.
The following is the actual production of the equipment:
Equipment Overview
Real shot of equipment operation:
Real shot of heat treatment workpiece:
PLC electrical control cabinet:
For details, please contact: